Schedule uncertainty in linear developments

Linear developments such as pipe or cable laying, road or rail building, or tunnelling, present challenges not found in other forms of construction. Analysis of the risk to their schedules may require a different approach from that used for the analysis of general construction projects. In some situations, existing schedule modelling tools lack the means to represent the particular features of linear developments. However, these can be addressed, with appropriate expertise, using two modelling tools and exchanging information between them.